Ahmedabad: Gujarat has once again positioned itself at the forefront of the renewable energy sector, adding 6,632 MW of green power between April and August 2025, almost matching the total capacity added in the previous fiscal year.
The state’s installed RE capacity, which was 25,471.7 MW on March 31, 2024, increased to 33,393 MW by March 31, 2025—a net addition of 7,921 MW in 12 months. The capacity further climbed to 39,275.7 MW as of August 21, 2025, with about 83% of FY 2025’s total c...Read More