Gates of Machhu-2 Dam opened for repair; 29 villages on alert
April 02, 2025
Morbi: The administration has begun repair work on Machhu-2 Dam in Morbi. After receiving the green light from the government, two gates of the dam were opened at 4 PM today by two feet. Water is being released in phases, starting from 1,300 cusecs and increasing up to 3,500 cusecs. A total of 20 villages in Morbi taluka and 9 villages in Maliya taluka have been alerted.
According to officials from the Machhu-2 Irrigation Sub-Division, to carry out the repair and replacement of the gates near Machhu-2 Dam, two gates were opened by two feet, releasing 1,300 cusecs of water. The water flow will be gradually increased in phases up to 3,500 cusecs. Additionally, residents of downstream villages in Morbi and Maliya Miyana talukas have been warned not to enter the riverbed.
Due to the water release from Machhu-2 Dam, residents of 29 villages have been alerted.
In Morbi taluka, the following villages have been placed on alert: Jodhapar, Lilapar, Bhadiyad, Timbdi, Dharampur, Ravapar, Amreli, Vanaliya, Gor Khijdia, Mansar, Nava Sadulka, Juna Sadulka, Ravapar, Gungan, Naranka, Bahadurgarh, Juna Nagdavas, Nava Nagdavas, Sokhda, and Amarnagar.
In Maliya taluka, the villages on alert include: Virparda, Derala, Navagam, Medhapar, Haripar, Mahendragarh, Fatepur, Songadh, and Maliya (Mi). Residents have been instructed to exercise caution and avoid crossing the riverbed.
It is worth noting that emptying Machhu-2 Dam during the summer is expected to impact the drinking water supply in Morbi. DeshGujarat
Recent Stories
- India vs SL Match
- Free rides on AMTS buses for three days during Diwali
- 100 years of service to nation was our duty, so no celebration is needed: RSS Chief
- Commonwealth Sport Board Recommends Ahmedabad as Host City for 2030 Commonwealth Games
- Gujarat CM to visit Mumbai for listing of SMC's green municipal bonds on NSE
